
Translink plays dead at the first lick of snow, but all over the world street level Light Rail & Tramways take the weather in their stride
In other words a few inches of snow doesn’t stop @ grade LRT/street level Tramways; a foot and so long as the snow sweaping is effective the LRV/Trams keep on operating. Croydon Tramlink TransLinkai??i??s bus company is expensive, inefficient and dysfunctional in inclement weather; US & European Tramways operate without a doubt in snow conditions. […]

Light Rail Fits in
Light Rail Fits in, that is unless you live in Vancouver where corruption, Canadian Transit Politics and incompetence threatens logic and commonsense Of all the modes of transport electric railways have proven to be the most successful in providing an alternative choice that entices people to leave their cars at home. With light rail it […]

Broadway needs SkyTrain rather than light rail, Vancouver city staff & Translink trot out the same old, same old.
Broadway needs SkyTrain rather than light rail, Vancouver city staff say http://www.straight.com/article-843831/vancouver/broadway-needs-skytrain-rather-light-rail-vancouver-city-staff-say By Yolande Cole, November 27, 2012 Vancouver city staff believe a subway SkyTrain line to UBC is the best way to meet the growing demand along the Broadway corridor, outweighing the option of a light-rail system that they say would not accommodate the […]

Surface LRT will “corrupt” rail system
In a letter to the Langley Advance, a spokesman for “SkyTrain for Surrey” says adding surface light rail to the Vancouver area rail transit system will “corrupt” the efficiency and cost recovery of the existing rapid transit system: http://www.langleyadvance.com/TransLink+SkyTrain+boosting+profits/6672346/story.html This is the link to the letter that, Daryl Dela Cruz ofAi??SkyTrain for Surrey objects to: […]

The Fruit of the Poisonous Tree – TransLink’s Regional Transit Planning
Fruit of the poisonous tree is a legal metaphor in the United States used to describe evidence that is obtained illegally.The logic of the terminology is that if the source of the evidence (the “tree”) is tainted, then anything gained from it (the “fruit”) is as well. TransLink’s planning officials still maintain that modern light […]

The Failure To Understand Modern Light Rail = Public Transit Chaos
‘Zwei’ has been taken aback by the viciousness of the SkyTrain Lobby and the great lengths they haveAi??Ai??taken in discrediting the LRT, while at the same time refusing to acknowledge the marketing failure of the proprietary (ICTS/ALRT/ALM/ART ) light-metro system, known in Vancouver as SkyTrain. ‘Zwei’ is also taken aback by abject refusalAi??Ai??by many supposed […]

A Poll That the Main Stream Media Ignored. Can We Expect The Same For Other Non SkyTrain ‘Rail’ Projects?
A very strange thing happenedAi??yesterday with ‘Zwei’. When I was discussing a transit matter with an US transit type about the RAV/Canada line. He told me that TransLink officials claimed that over 80% of Vancouverites supported RAV and if it were not for the high costs of the metro, many more metro type transit systems […]
Recent Comments