U-Tube – a tool, transit advocates must make good use of – seeing, is believing.

In the 1980’s, the SkyTrain lobby made all sorts of pronouncements about transit and ALRT, that were not true. It took transit advocates over a month to write to experts and wait for their replies. By the time the facts were available, the media moved on and most of the hoopla from BC Transit became […]

Category: zweisystem · Tags: , , ,

A Question of Capacity – A LRTA Topic Sheet

A QUESTION OF CAPACITY THE CAPACITIES of different modes of transport are generally quoted as 0-10 000 passengers per hour for bus, 2000-20 000 for light rail, and 15 000 upwards for heavy rail. A?A?A? Maximum capacity is only likely to be required for a few hours during peak hours, and even here there are […]

West Broadway Business Association calls for light rail

A new group, the West Broadway Business Association, has been formed: The WBBA is a non-profit society representing the local interests of businesses along West Broadway, from Alma to Burrard, and beyond to Cambie. They’re calling for a surface-level light rail or tram system along Broadway instead of the current plan to build a subway: […]

Does light-rail make the grade?

There is a common misconception, especially with loal transit planners, that light-rail can’t climb steep grades. The industry standard (crush capacity or all seats taken and 8 persons per square metre standing) for the maximum gradient that modern LRT can climb is 8%. Sheffield’s trams (streetcars) because all axles are motorized, can climb 10% grades […]

Category: zweisystem · Tags: , ,

Transit lessons unlearned – Part 2

In the 1980’s there was much debateAi??Ai??between modern light-rail and many proprietary transit systems being offered for sale, which included the SkyTrain ICTS/ALRT automatic light-metro. Many claims were made by the owners of various proprietary transit systems being offered for sale, about the effectivenessAi??Ai??of their transit systems. In 1991, Gerald Fox a noted American transit […]

Category: zweisystem · Tags: , , , , ,

Transit lessons unlearned – Lesson #1

In the very early 1980’s, the Ontario Conservative Party (the William Davis Government) tried to force the Toronto Transit Commission (TTC) to build with theAi??Ai??new Intermediate Capacity Transit System or ICTS, now known as SkyTrain; produced by the Urban Transit Development Corporation (UTDC) an Ontario crown corporation. The TTC commissionedAi??Ai??a comprehensive studyAi??Ai??comparing streetcars/LRT and metro […]

Category: zweisystem · Tags: , , ,

The case for Diesel LRT for the metro Vancouver region.

Diesel light-rail is a light-rail vehicle which is powered by a diesel engine, rather than electricity, conforming to the operational parameters of modern LRT. ThisAi??Ai??meansAi??Ai??Diesel LRTAi??Ai??can be installed very cheaply on routes that would otherwise not be considered for ‘rail’ transit, as itAi??Ai??forgoes the expense of the ‘overhead’ for electric transmission,Ai??Ai??giving large cost savings on […]

Can TransLink’s business cases be trusted?

Since last spring, the Light Rail Committee has circulated an E-Mail sent by American transit and transportation expert, Gerald Fox to a Victoria transit group that wants to promote LRT and diesel LRT into the Capital Region. Mr. Fox easily shreds TransLink’s business case for the Evergreen Line which shouldAi??Ai??forewarn transit groups in the Fraser […]

Diesel light-rail to Chilliwack – What will it cost?

One Canadian transit line, seldom mentioned by TransLink or the Minister for Transportation is Ottawa’s 8 km. diesel LRT line, called the O-Train. The five-station route connects to Ottawa’s existing east-west bus Transitway system with simple stations at its north and south ends. Because it uses an existing rail line, it cost only about $4 […]

Trams on the cheap – Part 2

Another news item from the Light Rail Transit Association (www.lrta.org), dispels the myth that light-rail or streetcars are very expensive to build. Here we have 5 km. of double track, including overhead, costing EUR 15 million or EUR 3 million per km. to build. In Canadian funds, EUR 15 million = CAD $27.75 million or […]