Referendum Angst

It will all about the TransLink Referendum in the coming months and regional mayors who haven’t a clue about modern public transit will try to force another tax upon the beleaguered taxpayer to fund questionable transit projects, that will do little to alleviate congestion and gridlock in the lower mainland. The following is a reminder […]

The Tours Tramway

The newly opened tours tramway, classic French design. Tours:Ai?? Population:Ai?? City 136,000; Metro Area 400,000 Distance:Ai?? 150 miles southwest of Paris, 1A? hours System Length:Ai?? 14.5 kilometres No. Lines:Ai?? 1 No. Stations:Ai?? 29 Year Opened:Ai?? 2013 Rolling Stock:Ai?? 21 Citadis 402 Passengers: 45,000 a day Cost: ai??i??369.1 million Euros (2009) CAD $518.595 (20014) An Artist […]

A Letter To The Mayor’s Council

Ai??The following letter, which has come Zwei’s way, was sent to all mayors and councils in Metro Vancouver. It seems, that the regional mayors are hell bound to get a positive vote in the coming TransLink referendum and they don’t seem to care about the voters or transit users at all. Yesterday’s Vancouver Province editorial […]

A Conflict of Interest – The Broadway Subway

TransLink, unfortunately digs very deep holes for itself and Mr. Chris exposes what they want the public to believe as fact, is in fact pure invention. http://www.translink.ca/~/media/Documents/plans_and_projects/rapid_transit_projects/UBC/alternatives_evaluation/UBC_Line_Rapid_Transit_Study_Phase_2_Alternatives_Evaluation.ashx There are two points I would like to explore, from Mr. Chris’s letter , posted on this blog on November 18. In 1986, the Light Rail Transit Association […]

The Le Havre Tramway

Le Havre:Ai?? Population:Ai?? City 180,000; Metro Area 300,000 Distance:Ai?? 125 miles west northwest of Paris, 125 minutes System Length:Ai?? 13Ai?? kilometres No. Lines:Ai?? 2 No. Stations: 23 Year Opened:Ai?? 2012 Rolling Stock:Ai?? 22 Citadis 302 Cost – Vehicles: ai??i??45m (CAD $62.62m) Cost of project: ai??i??395m (CAD $550m) which includes a 575 metre tram tunnel In […]

Tunnel Vision Versus Green Vision

Ai??

Making Sense From TransLink’s Nonsense

The following is from the RftV friend, Eric Chris. Mr. Chris is a graduate engineer and he sees through TransLink and TransLink Speak. ***** TransLink is bending the truth to keep the ones who are responsible for the massive fraud (that s-train has more capacity than other modes of transit) from being jailed for the […]

TransLink: LRT is suitable for Broadway!

A post from our friend Mr. Haveacow deserves more attention. Contained within is an interesting comment; “They have chosen that overall the Skytrain is the best choice (no surprise there). The whopper comes form the admission that LRT is cheaper and does provide better service over the status quo but the cost is significantly less […]

Tunnel Vision vs. Green vision

The following power point presentation comes from Adam Fitch and succinctly shows the difference between light rail and a Skytrain subway under Broadway. Click and view. Tunnel Vision vs Green vision   UPDATE: WE HAVE TECHNICAL PROBLEMS, MY APOLOGIES

BCIT to UBC and Picnics in the Park, by tram

First published in 2009. Updated 2014. A Wee Bit Of Local History In early 1996, during BC Transitai??i??s meaningless public consultation period for the Broadway Lougheed Rapid Transit Project which later morphed into the Millennium Line, Zweisystem received a phone call from an European Transit specialist, who worked for Asea Brown Boverai (later absorbed by […]