Of Pressers, Photo-ops and Gadgetbahnen

Premier Horgan doesn’t get it. The NDP don’t get it. The Liberals don’t get it. The metro mayors don’t get it. We are governed by a ship of fools. What we are getting is a $3 billion subway, which will operate a capacity limited proprietary railway, which will drive up TransLink’s operating costs and will […]

An Ongoing Charade

Gordon Campbell is gone, due to his less than honest performance with the combined GST/PST, which cost him the Premiership. The public had enough and wanted him gone. But, Gordon Campbell echoed then and what still echoes today with the Mayor’s Council on Transit, TransLink and in Victoria, that somehow SkyTrain is superior to light […]

Budapest "Caterpillar" tram; 54 metres long, capacity 350 persons.

The Fruit of the Poisonous Tree – From 2010

Now, a decade later, the City of Vancouver’s Engineering Department still claims that LRT is limited to a capacity of only 7,000 to 8,000 pphpd! Yet the very same CoV department has never mentioned that the Canada Line, with 40 metre long station platforms can, only allow 41 metre, 2 car trains, which limits capacity […]

From 2010 – Late Friday Night’s Musings For Saturday Reading

From July 2010 Late Friday Night’s Musings For Saturday Reading Posted by zweisystem on Saturday, July 3, 2010 Zwei, with a cup of tea in hand, has been reading the various transit blogs and answering emails from interested parties around the world, trying to get a read on what direction public transit is going in […]

TransLink’s Fear Of The Future And “The Interurban”

  From Wiki: Rapid transit or mass rapid transit (MRT), also known as heavy rail, metro, subway, tube, U-Bahn, metropolitana or underground, is a type of high-capacity public transport generally found in urban areas.Unlike buses or trams, rapid transit systems are electric railways that operate on an exclusive right-of-way, which cannot be accessed by pedestrians […]

Charleroi - A staion built but never used

The Charleroi. Could This Be The Fate Of The Broadway Subway?

The Charleroi, the metro extension that never was. Since the story of the Charleroi pre-metro was first posted in 2009 (see story below), nothing has changed and talks of completing the line have come to naught. Could be the fate of the $3 billion Broadway subway?  Built, but far too expensive to operate and portions […]

Has The Great TransLink Lollipop Ride Ended?

Fiscal reality is now hitting TransLink and the Mayor’s Council on Transit square in the face. Memo to the Mayor’s council on Transit: It is time to rethink your transit priorities, especially that $4.6 billion price tag to extend the MALM system (Expo & Millennium Lines) 12.8 km. The estimated added $40 million annual operating […]

It Is Time For TransLink And The Mayor’s Council Rethink Light Rail

It is time, during this pandemic crisis and the billions of dollars being spent for the security of Canada and Canadians, it is time TransLink and the Mayor’s Council on Transit rethink their stand on light rail. It is time that TransLink and the Mayor’s Council on Transit show fiscal responsibility for public transit and […]

Is It Time To Rethink SkyTrain Expansion?

As reported, the ongoing Covid-19 epidemic has greatly reduced transit ridership. A 52% drop in boarding’s from March 19, 2019 to March 19, 2020 is greatly affecting TransLink’s bottom line. With over 80% of SkyTrain’s ridership first take a bus, the collapse of ridership must be dealing a vast economic blow to TransLink! The SkyTrain […]

Time To Rethink Transit – Tramways Instead Of Light-Metro?

Montpelier, France What the following article is talking about is not light rail, rather a tramway or streetcar. Light rail is a streetcar operating on a reserved or dedicated rights-of-way and by doing so, offers a service superior to that of a light metro and close to that of a heavy-rail metro. Building a tramway […]