Of Pressers, Photo-ops and Gadgetbahnen

Premier Horgan doesn’t get it. The NDP don’t get it. The Liberals don’t get it. The metro mayors don’t get it. We are governed by a ship of fools. What we are getting is a $3 billion subway, which will operate a capacity limited proprietary railway, which will drive up TransLink’s operating costs and will […]

A Post From Mr. Haveacow – Speedy Transit

The avatar, “Haveacow” is used by a very knowledgeable Canadian transportation specialist. He knows what he is talking about and Zwei greatly respects his input. Since SkyTrain was first foisted on the taxpayer, one of the many false claims for building with it, was that it was fast. There are problems with this claim, including: […]

From 2009 – The Light Rail Committee

A repost from 2009   A 2007 Presentation on Valley Rail – by the Light Rail Committee Posted by zweisystem on Thursday, June 25, 2009 First, before any discussion about rail transit, including Light Rail Transit, we must define LRT and other transit modes. The following is a brief descriptions of various transit modes advocated […]

An Ongoing Charade

Gordon Campbell is gone, due to his less than honest performance with the combined GST/PST, which cost him the Premiership. The public had enough and wanted him gone. But, Gordon Campbell echoed then and what still echoes today with the Mayor’s Council on Transit, TransLink and in Victoria, that somehow SkyTrain is superior to light […]

Budapest "Caterpillar" tram; 54 metres long, capacity 350 persons.

The Fruit of the Poisonous Tree – From 2010

Now, a decade later, the City of Vancouver’s Engineering Department still claims that LRT is limited to a capacity of only 7,000 to 8,000 pphpd! Yet the very same CoV department has never mentioned that the Canada Line, with 40 metre long station platforms can, only allow 41 metre, 2 car trains, which limits capacity […]

From 2010 – Late Friday Night’s Musings For Saturday Reading

From July 2010 Late Friday Night’s Musings For Saturday Reading Posted by zweisystem on Saturday, July 3, 2010 Zwei, with a cup of tea in hand, has been reading the various transit blogs and answering emails from interested parties around the world, trying to get a read on what direction public transit is going in […]

STOP PRESS – Another Transit Study For The Fraser Valley. In Time For The Next Election?

Zwei is going to reserve comment, except for the fact that Rail for the Valley’s  Leewood Study, lays the groundwork for a viable regional rail service for the Fraser Valley. The Leewood Study, please click here. Transportation planning study launches in Fraser Valley   As part of BC’s Restart Plan, the Province is examining a […]

Comparisons

Let us make a comparison. In B.C., we are spending $4.6 billion to extend the Expo and Millennium Line’s a mere 12.8 km, while in the UK, £1.2 billion (CAD $2.04 billion) is being spent t0 reopen four rail lines (this means completely rehabbing and re signalling the lines); upgrading three rail lines for improved […]

Germany To Reopen 4,000 km of Closed Railway Lines

What is happening elsewhere is not happening here. Instead, in BC government is squandering  billions of dollars on uneconomic ‘rapid transit‘ lines to suit their electoral and bureaucratic needs. “Rapid Transit is needed infrastructure” is the claim by government, except the politicians making the decisions do not have a clue what rapid transit is or […]

TransLink’s Fear Of The Future And “The Interurban”

  From Wiki: Rapid transit or mass rapid transit (MRT), also known as heavy rail, metro, subway, tube, U-Bahn, metropolitana or underground, is a type of high-capacity public transport generally found in urban areas.Unlike buses or trams, rapid transit systems are electric railways that operate on an exclusive right-of-way, which cannot be accessed by pedestrians […]