Over-Designed’ Megaprojects Are Bad For Environment And Taxpayers

Sadly, the same is true in BC and Canada, where politicians fully believe the more money one spends on transit, the better is is. We are currently spending around $11 billion to extend the SkyTrain light metro system a mere 21.7 km. Current Cost Estimates: Surrey Langley SkyTrain – $4.6 billion to $5.1 billion Broadway […]

Listen To The Experts

When Patrick Condon, BSc, MLA,  Professor Chair, Urban Design Faculty of Applied Science School of Architecture and Landscape Architecture says a new transit vision is needed in metro Vancouver, we should listen. We should have listened to the experts in the 1980’s when the then social Credit government forced ALRT onto the regions regional transit […]

The End Of The SkyTrain “Gravy-Train?

Gravy Train: Used to refer to a situation in which someone can make a lot of money for very little effort. Mr. Cow’s comment in the previous post, deserves a post of its own, because it could be a game changer in regional transit planning. Criticizing regional transit planning has been somewhat taboo with the […]

Maintenance Costs – What Politicans Ignore

This is a must read as maintenance is one of the least understood functions of operating a transit system. It is often ignored by politicians because most politicians do not understand it nor want to due to unpleasant tax implications that tend to be embarrassing at election time. The Ottawa LRT/Light-Metro is a very good […]

T.E.A.M’s LRT – Offering Much More Light Rail At A Far Cheaper Cost.

Again, old Zwie, the Curmudgeon Laurette of transit, is delighted that Vancouver T.E.A.M. mayoralty candidate Colleen Hardwick is talking LRT while those running against her are still talking dated light-metro. So, let us have a look at costs of the three proposals. T.E.A.M’s Hardwick’s 58 km of LRT The Aprox. 7 km Millennium Line subway […]

Mississauga and Brampton – The Hurontario LRT

It is an interesting comparison that in Vancouver, 5.7 km of SkyTrain light-metro subway will cost over $3 billion and 16km of new SkyTrain light metro in Surrey and Langley will cost around $5 billion (both projects will actually cost over $11 billion for 21.7 km of new line, including the much needed rehab), while […]

What Is The Real Cost For The Expo & Millennium Line Extensions?

It is the civic election season, or more fondly called the “silly season” and all sorts of claims and promises are made. Recently on a local radio talk show a politcal wannabe claimed that; “SkyTrain operates almost free because it does not have any drivers and is cheaper than LRT” and the host agreed with […]

Zwei Replies……………………

  The following has been posted on Facebook and other transit blogs with some unfavorable comments about RftV. First off, the article is by Alon Levy, a chap I have never heard of before, who has been described as an expert. An expert, well I think not, but neither is good ole Zwei for that […]

BC Transportation Minister, Rob Fleming, Must Resign!

Zwei has real issues from the following two statements from BC Transportation Minister Rob Fleming. . “In fact, what they analyzed was the superiority of high-frequency bus service, both from a capacity point of view – to move people out of their cars as the member wished for – and also to give flexibility in […]

Reality Check: Has TransLink Again Mislead The Public?

It is hard to surprise ole Zwei these days, but the following has somewhat astounded me. Expo and Millennium Upgrade Program The Expo and Millennium Line are the region’s Rail Rapid Transit Lines that connect key locations across Metro Vancouver. The Expo Line opened in 1985 and was the region’s first rail rapid transit line. […]