User Freindliness In Berlin

In Metro Vancouver, again and again, one hears calls for the light metro system to operate 24/7. It cannot, or put in another way, it can but it would increase maintenance costs considerably and TransLink is near broke. The reason is quite simple, automatic or driverless operation. Simply, the light metro system need preventative maintenance […]

Same Opportunities – Same Excuses

Light rail is not a panacea, but it is a proven method in reducing auto traffic, something those promoting SkyTrain cannot claim. Building with trams opens an opportunity for not only providing a user-friendly and environmentally- friendly alternative to the car, the mode offers an almost universal transit mode as the modern tram can operate […]

And Then There Was Six

Alas, poor SRT! I knew of it, TTC: A system of infinite cost, of most expensive fancy: It hath taken us more than thousand times; and now, how abhorred it is! My gorge rims at it. Here, it cost much money, I know not how much. Where be your new systems now? Your LIM’s so […]

The Rail Renaissance In Europe.

As Europe is rediscovering travel by rail, in Canada rail travel is treated with disdain, yet in the age of Global Warming and climate change, the train is making a strong comeback for travel. It is my contention, that when federal and provincial politicians and bureaucrats are banned from taking planes for travel under 1500 […]

Incompatible Transit – A Taxpayer’s Nightmare

I thought this would be an interesting article as we have in Vancouver two incompatible light metro systems, the Canada Line and the Expo and Millennium Lines. The Canada Line uses ROTEM built EMU’s, standard railway fare and can be used on most standard gauge electric railways. The Expo and Millennium lines use the proprietary, […]

As Preddicted, Major Switch Replacement Begins.

Mr. Cow has been bang on with his predictions of the growing cost of SkyTrain light metro expansion and the following news item certainly shows the ongoing expensive problems TransLink faces. Replacing two switches should take a weekend at most, but these are new high-speed switches, which needs a lot of engineering done to the […]

Flexibility To Fight Climate Change

Flexibility is the key in today’s transit planning. More and more, freight that used to be carried on railways, then switched to heavily subsidized trucks on heavily subsidized highways, is now goring back to the railways. Ignoring Global Warming and climate change is a fools game, played by civic, provincial and federal politicians to the […]

Old Noise Issues Plague SkyTrain

This problem has been around a long time, small wheels means more revolutions and more wear of the track’ correlated rails; and a strict regimen of rail grinding and preventative maintenance of the steerable axle trucks. This costs a lot of money and TransLink has never been good with maintenance issues. TransLink is near broke […]

TramTrain – It’s Time To Have Another Look At The Leewood Project

While local politicians squabble about expensive transit planning and gouging the taxpayer to pay for multi billion dollar transportation vanity projects, economic and user friendly TramTrain construction and operation continue to increase. Isn’t time for politicians have another look at the Leewood/Rail for the Valley Study? Chemitz TramTrain on the mainline. A Langley to downtown […]

Why TransLink Can’t Be Honest? A Repost From March 2017

Six years later, not much has changed. Thales has signed a $1.47 billion contract for re-signalling the Expo and Millennium Lines but with capacity only increasing by 2,500 pphpd to 17,500 pphph for the Expo Line and for an astonishing increased maximum capacity of only 7,500 pphpd for the Millennium Line. A maximum capacity of […]