Tech. stuff for light rail – The LR55 rail system
What is of interest is that the SkyTrain lobby decry any sort of LRT/streetcar installation on Broadway as catastrophic, yet tram tracks can be laid quite quickly, depending on the method used, in Nottingham, penalties were to applied against the contractor, if tram track installation were to directly affect merchants directly adjacent to the construction […]
Hong Kong TramwayA?ai??i??ai???s, the wee trams (streetcars) that can!
The following is an updated version of the original January posting. The Hong Kong Tramway’s have reported an increase in ridership to about 280,000 passengers a day for 2008, showing that even little narrow gauge trams can carry large volumes of passengers for a fraction of the cost of a subway like RAV. So when […]
Why we built with LRT – first published in December 2008, updated August 17, 2009
The following was first published in December 2008 and is being reproduced here because of popular demand. Ai??Ai?? What is Light Rail Transit or more commonly known as LRT? According to the Light Rail Transit Association (www.lrta.org) Light rail is a mode that can deal economically with traffic flows of between 2,000 and 20,000 passengers […]
From Charlie Smith & The Georgia Straight – Canada Line subsidy will be felt for years to come
Charlie Smith of the Georgia Straight is probably the regions best reporter on transit issues as he has researched SkyTrain and all other transit issues for almost two decades and his insight to RAV andAi??Ai??SkyTrain issues clearly demonstrate this. What is not mentioned is that RAV will drain money away from the bus system, simply […]
The SkyTrain lobby – "Pixie Dust planning"
One finds it interesting how the SkyTrain lobby warps the truth to suit it’s own ends. What the SkyTrain lobby is really saying is that; “We completely discount over oneAi??Ai??hundred and fifty yearsAi??Ai??of rail/light rail/metro development, to support a unconventional, proprietary railway.” That only seven such systems have been built (actually there are two types […]
A letter to the Editor the Vancouver Sun will not print
The following letter to the Editor of the Vancouver SunAi??Ai??was sent to Zweisystem because the author knows full well that the Can West media Empire will not print it. What this letter shows that the region is bereft of any credible transit and transportation reporters and many important and embarrassing stories are missed by the […]
More European Tram-Trains – Rail for the Valley offers a challange to Translink and BC Transportation Minister Shirely Bond
In 1994, the GVRD, in an attempt to include the public in the planning process, held a two hour call-in about regional transit, on local cable channels.Ai??Ai??A panel of experts were on hand to answer the publics questions about transit issues, including rapid transit. Zweisystem phoned in and asked a question: Has BC Transit and/or […]
L.A. Times Columnist: American trains and transit will always suck. – Well if US trains & transit suck, god help Canada’s trains & transit!
The following is from The Infrastructurist http://www.infrastructurist.com/about/ Ai?? YesterdayA?ai??i??ai???s dispatch from LA Times business writer David Lazarus has a great lede: A?ai??i??Ai??ItA?ai??i??ai???s hard to appreciate how truly pitiful our public transportation system is until you spend some time with a system that works.A?ai??i??A? Many of us know that feeling. Then he gushes about the consistently […]
Rail for the Valley TramTrain – Arhus aims to pioneer Danish tram-train: Denmark’s second-largest city is planning the country’s first tram-train project. – From bNet
Here is another example for Rail to the Valley of TramTrain beingAi??Ai??planned forAi??Ai??in Europe. The theme is all too familiar, designing a transit system to cater to the needs of the customer, using existing railway infrastructure to reduce cost, while at the same time increasing service. The theme of TransLink is simple, we are going […]
The many faces of tramtrain; how soon will the Fraser Valley see one?
It has been a long established transit maxim, long ignored by TransLink and BC Transit before, “use existing rail routes first“. Why? Because existing rail routes are much cheaper to build and install light rail, rather than going ‘greenfields’ construction.Ai??Ai?? Of course, SkyTrain and RAV are the epitome of ‘greenfields’ construction! The cost to build […]




Recent Comments