How The NDP Paved Paradise and Turned It Into a Parking Lot. A Repost From 2020
This is a repost of a November 2020 blog post. The estimated cost for a 21.7 km extension of the Millennium Line (Broadway subway) and the Expo Line (Surrey – Langley extension) is now past $11 billion. The NDP are setting in motion a highway’s only planning for the future, doubling down on BC’s famous […]
Vancouver Will Need To Adopt Lower-Cost LRT In Its Lesser Corridors – Updated
The consensus is the same, Metro Vancouver will need to adopt lower-cost LRT for its future transit needs. This was first posted in 2019 and the costs and the financial numbers have changed somewhat. Currently, the province and metro Vancouver is spending over $11 billion for 21.7 km of new light-metro line, including the Broadway […]
REM – The Karma Vanishes As REM Goes Ka-Put
Despite all the hype and hoopla with Montreal’s new REM light metro, the first day’s service was a shambles. A stuck switch, on opening day? This is a bad omen for the light metro system. With an at-grade tram or light rail, a stuck switch can be operated manually, but on a fully automatic and […]
A Very Close Call – The Public Needs An Inquiry
Poor maintenance can be traced to TransLink’s dire financial ills. Sadly the mandarins running TransLink do not seem to be acquainted with the nuances of maintaining the railway and the SkyTrain light-metro system is a railway. Track switches are an integral part of the railway and must be constantly maintained, yet TransLink seems to have […]
Gold Plated Union Contract For A Gold Plated Transit System
Hmmm – election coming and a fear of of another transit strike, well what can a government do? Give transit workers a “gold plated” union contract. TransLink, despite claims otherwise, is run by the premier’s office. All major TransLink decisions must have the approval by the Premier of British Columbia and this union contract is […]
The Staggering cost of Subway Construction – A repost from 2019
A re-post from 2019. It seems several TransLink and City of Vancouver bureaucrats are tying the spin that subways are cheaper in the long run. Of course, they do not give firm numbers on anything! Some transit blogs seem to think that building a subway is easy peasy , costing only a little more than […]
And Then There Was Six
Alas, poor SRT! I knew of it, TTC: A system of infinite cost, of most expensive fancy: It hath taken us more than thousand times; and now, how abhorred it is! My gorge rims at it. Here, it cost much money, I know not how much. Where be your new systems now? Your LIM’s so […]
Incompatible Transit – A Taxpayer’s Nightmare
I thought this would be an interesting article as we have in Vancouver two incompatible light metro systems, the Canada Line and the Expo and Millennium Lines. The Canada Line uses ROTEM built EMU’s, standard railway fare and can be used on most standard gauge electric railways. The Expo and Millennium lines use the proprietary, […]
As Preddicted, Major Switch Replacement Begins.
Mr. Cow has been bang on with his predictions of the growing cost of SkyTrain light metro expansion and the following news item certainly shows the ongoing expensive problems TransLink faces. Replacing two switches should take a weekend at most, but these are new high-speed switches, which needs a lot of engineering done to the […]
Old Noise Issues Plague SkyTrain
This problem has been around a long time, small wheels means more revolutions and more wear of the track’ correlated rails; and a strict regimen of rail grinding and preventative maintenance of the steerable axle trucks. This costs a lot of money and TransLink has never been good with maintenance issues. TransLink is near broke […]




Recent Comments