From 2009 – The Light Rail Committee
A repost from 2009 A 2007 Presentation on Valley Rail – by the Light Rail Committee Posted by zweisystem on Thursday, June 25, 2009 First, before any discussion about rail transit, including Light Rail Transit, we must define LRT and other transit modes. The following is a brief descriptions of various transit modes advocated […]
A Decade Later, Nothing Changes – A Repost From 2010
A decade later and the same same ills plague transit planning in the Metro Vancouver region. The strangle hold that Vancouver and Surrey have on the region is causing much fiscal mismanagement, as it is deemed, what is good for Vancouver and Surrey politicians is good for the region. The provincial government seems OK with […]
From Jan. 2011
Pertinent today, as it was almost ten years ago. From January 2011: Rail For the Valley completes Analysis of Fraser Valley Transit Study Posted by John Buker on Tuesday, January 11, 2011 Here is our media release: Rail For the Valley completes Analysis of Fraser Valley Transit Study * After years of delays the B.C. […]
The Fruit of the Poisonous Tree – From 2010
Now, a decade later, the City of Vancouver’s Engineering Department still claims that LRT is limited to a capacity of only 7,000 to 8,000 pphpd! Yet the very same CoV department has never mentioned that the Canada Line, with 40 metre long station platforms can, only allow 41 metre, 2 car trains, which limits capacity […]
From September 15, 2010 – A Decade later, Nothing Has Changed
What I find amusing is that policy on regional transit has not changed as politicians do the same thing over and over again, ever expecting different results. It’s easy and they just don’t have to waste time dithering over details and anyways; “the taxpayer has deep pockets and will ante up to pay for our […]
From 2010 – Late Friday Night’s Musings For Saturday Reading
From July 2010 Late Friday Night’s Musings For Saturday Reading Posted by zweisystem on Saturday, July 3, 2010 Zwei, with a cup of tea in hand, has been reading the various transit blogs and answering emails from interested parties around the world, trying to get a read on what direction public transit is going in […]
STOP PRESS – Another Transit Study For The Fraser Valley. In Time For The Next Election?
Zwei is going to reserve comment, except for the fact that Rail for the Valley’s Leewood Study, lays the groundwork for a viable regional rail service for the Fraser Valley. The Leewood Study, please click here. Transportation planning study launches in Fraser Valley As part of BC’s Restart Plan, the Province is examining a […]
Flexibility
Flexibility: Susceptible of modification or adaptation; adaptable. Dresden’s successful freight tram, carried car parts from one factory to another in the city. Modern light rail is very flexible; it can operate as a tram, operating on-street; it can operate as a light-railway, operating on a dedicated rights-of-way; it can operate as a light-metro, on viaduct […]
Memo
I know it is preaching to the converted, but we must get serious about regional transit. $4.6 billion to build 12.8 km of light metro is not spending money wisely. Spending $4.6 billion to build 12.8 km of light metro is based on dated thinking; dated engineering; dated planning; dated transportation philosophy; as well as […]
Comparisons
Let us make a comparison. In B.C., we are spending $4.6 billion to extend the Expo and Millennium Line’s a mere 12.8 km, while in the UK, £1.2 billion (CAD $2.04 billion) is being spent t0 reopen four rail lines (this means completely rehabbing and re signalling the lines); upgrading three rail lines for improved […]




Recent Comments