Oxymoron

  TransLink advisory: In anticipation of bad weather Millennium Line is operating with 4 car trains so increased capacity but reduced frequency. Memo to TransLink: 2 car trains, operating at 2 minute headway’s (30 trips per hour), capacity equals 6,000 pphpd. 4 car trains operating at 4 minute headway’s (15 trips per hour), capacity equals […]

A Comment Worth Reading – Costs!

The chap who uses the avatar Haveacow is a transit and transportation expert and it is a must, reading his comments; I certainly do! I have been in this game for almost 35 years and the song sung by the SkyTrain lobby never changes. Those defending light metro in Metro Vancouver never deal with costs. […]

It Is Essential That LRT Is Designed By Consultants With Expertise In Modern LRT!

TransLink has absolutely zero expertise with modern light rail, yet continually plans for grossly inferior light rail lines which under scrutiny shows so many flaws that their plans become laughable. The latest was then Surrey LRT, which was so over engineered and so gold-plated, it became unafordable and was easily pushed aside by the SkyTrain […]

Expo & Millennium Line Ridership – 150,000 Per Weekday

It is interesting, the on going debate about the SkyTrain light metro’s ridership, especially when TransLink’s spin doctors tell the truth. This comment by a TransLink spokesperson caught me by surprise and it has been repeated in both the mainstream and electronic media. Just has to be true! TransLink characterized this job action as unreasonable […]

OK Mr. Horgan and Translink, Why not TramTrain?

  It has now been 10 years since Rail for the Valley commissioned the Leewood Study on reestablishing a passenger rail service from Vancouver to Chilliwack and all the public got was invented excuses from all levels of government. Light rail doesn’t work; no one will take it, too circuitous a route; etc., were the […]

Reality Check

Transit rule number 1: You got to have funding to build and operate a transit line. The Mayors Council on Transit, is a little weak on this issue, especially after a mostly federal/provincial funded $4.6 billion grant to build 12.8 km of extensions to the Expo and Millennium Lines. They also approved an increased of […]

Rorschach Test

The Zurich tram system. Overview: The tram network serves most city neighbourhoods, and is the backbone of public transport within the city. Open: 1882 Cauge: Metre Number of routes: 15 Route length: 118.7 km (73.8 mi) Owner: Zürich Propulsion system(s): Electric Track length (total): 171.9 km (106.8 mi) Track length (double): 72.9 km (45.3 mi) […]

Seriously Deluded, Or…….?

Really? Is this the best we can expect from TransLink, deception? Two quotes from TransLink CEO, Kevin Desmond, are very disturbing: Desmond called the Canada Line, which just celebrated its 10th anniversary, a “smart investment”. “But, he said, he hopes the region has learned that lesson, adding that “help is on its way” for the […]

Future Funding Implications Threaten Regional Transit Projects.

With the clear evidence that transportation authorities around the world opting to build with LRT, one must pose, again, the question; Why does TransLink inflate the cost of light Rail? The simple answer is, “they don’t want to build with light rail, so they inflate the cost to match that of SkyTrain. From the Briefing […]

The $4.6 billion Question

  $4.6 billion is a lot of cash, but in metro Vancouver, $4.6 billion (well that is the amount funded) buys you a mere 12.8 km of the decidedly obsolete light metro system, now called Movia Automatic Light Metro, used on the Millennium and Expo Lines. So much money, for so little transit. It maybe […]