TramTrain Gains Favour In The UK

TramTrain development in the UK is gaining momentum as the Yorkshire Post reports that a study indicates a tram-train link between MANCHESTER and its airport in north-central England would be a better choice than passenger rail because of grades along the route. Victoria and Metro Vancouver are candidates for TramTrain, yet the powers that be […]

Subways Are Very Expensive

Despite the cries of shock and disbelief from the peanut gallery, subways are very expensive to build and equally expensive to maintain. * Dusseldorf’s 2.11 mile (3.4 km) cost USD $960.6 million (CAD $1,317.45) billion works out to CAD $387.5 million/km to build, which is the upper end of the cost estimate given by our […]

A good read

  There is an interesting article making its rounds, “5 lessons from Los Angles on transforming transportation (and coming after Portland)”,Ai?? in the various transit blogs and I believe it is well worth a read. Zwei is going to comment briefly on each of the five lessons and how they would apply to Metro Vancouver. […]

What about the Patullo Bridge?

Both the Patullo and the Fraser River rail bridges have well past their “best by” dates and desperately are in need of replacement. In 1978, the GVRD were poised to install a three leg light rail system on the region and to cross the Fraser river a new bridge would have to be built. Demonstrating […]

TransLink names Kevin Desmond new CEO

Is this just changing the chairs on the Titanic, or will Mr. Desmond actually achieve? I am not holding my breathe, as a far better former CEO, Tom Prendergast soon understood the root cause of TransLink’s ills and was promptly sent to Coventry by senior bureaucrats. The result, he left TransLink. Building subways and ill […]

Subway Blunders in Europe ai??i?? Can “Old Dog” TransLink Learn From Otherai??i??s Mistakes?

Subway Blunders in Europe ai??i?? Can TransLink Learn From Other’s Mistakes? From a September 2012 post. Unfortunately, many of the links no longer work and have been omitted for brevity. Herr Keller is a German transit specialist from Germany and gives wonderful insight to the pitfalls of building new subways for the sake of building […]

Perils of a Proprietary Transit System

Bombardier Inc. loves proprietary transit systems, because of the “gotcha” factor. Once a transportation authority purchases a proprietary transit system, they are stuck with one manufacturer and if problems arise, too bad. This is what happened in Caen, where in 2002, the city’s transportation authority purchased the proprietary Guide Light Transit guided bus system or […]

Professor Condon on CBC Radio

  A BCIT to UBC surface light rail line would reduce traffic congestion, while at the same time allow cars to access merchants along Broadway UBC Planning Professor Patrick Condon was on CBC Radio on Jan. 29, echoing the growing concern about the proposed Broadway SkyTrain subway sucking away federal monies from other local transit […]

The White Elephant Line

A white elephant is a possession which its owner cannot dispose of and whose cost, particularly that of maintenance, is out of proportion to its usefulness. To recap, the Canada Line is not a true P-3, rather a mock P-3, where SNC Lavalin/Bombardier, bid against, SNC Lavalin/ROTEM. Judge Pittfield who resided over the failed Susan […]

Lund Sweden – New TramWay to Cost $23.3 Million/km to Build

Contrary to TransLink’s habitual gold-plating of its LRT projects, modern light rail can be built reasonably cheaply, when compared to other modes of transit. The cost of the 5.5 km. starter tram line in Lund Sweden, with seven trams is estimated to be CAD $128.1 million or about $23.3 million/km to build. Not bad considering […]